Screw Pump Vendor Proposal Review Checklist

Comprehensive TBE checklist for screw pump vendor proposals including technical compliance, performance verification, materials review, and scoring template for Equipment Engineers.

API 676

1. Technical Compliance Checklist

General Requirements

ItemYesNoN/ANotes
Vendor on Approved Vendor List (AVL)
Pump type matches specification
API 676 compliance confirmed
Deviations clearly listed
All datasheet fields completed

Process Requirements

ItemSpecifiedOfferedAcceptable
Rated flow (m³/h)□ Yes □ No
Differential pressure (bar)□ Yes □ No
Operating temperature (°C)□ Yes □ No
Design pressure (barg)□ Yes □ No
Operating viscosity (cSt)□ Yes □ No
Cold start viscosity (cSt)□ Yes □ No

Mechanical Requirements

ItemYesNoNotes
Relief valve includedCRITICAL
Relief valve set pressure correct≤110% operating
Nozzle sizes correct
Flange ratings correct
Baseplate design adequate
Drain and vent provided

2. Performance Verification

Flow and Efficiency

ItemYesNoNotes
Performance curves provided
Curves at specified viscosityCRITICAL
Rated point marked on curves
Flow tolerance stated (±3%)
Slip percentage specified
Volumetric efficiency stated

Operating Point Analysis

ParameterValueWithin Range?
Flow at rated speed___□ Yes □ No
Slip at operating viscosity%□ <10% OK
Volumetric efficiency%□ >85% OK
Overall efficiency%□ >70% OK
Power at duty pointkW□ Within motor

Viscosity Coverage

ConditionViscosityCovered?
Cold start (min °C)___ cSt□ Yes □ No
Normal operation___ cSt□ Yes □ No
Hot operation (max °C)___ cSt□ Yes □ No

3. Displacement and Speed

Displacement Verification

ItemSpecifiedOfferedNotes
Displacement (cc/rev)
Rated speed (RPM)
Speed range (if VFD)
Theoretical flow (L/min)

Speed Considerations

CheckYesNoNotes
Speed appropriate for viscosity
VFD required and included
Minimum speed stated
Maximum speed stated

4. Material Verification

Wetted Parts

ComponentRequiredOfferedCompatible
Casing□ Yes □ No
Rotors/Screws□ Yes □ No
Shaft□ Yes □ No
Bearings□ Yes □ No
Wear components□ Yes □ No
O-rings/seals□ Yes □ No

Special Requirements

RequirementRequiredConfirmed
NACE MR0175 compliance□ Yes □ N/A
Low temperature rating□ Yes □ N/A
Food grade (FDA)□ Yes □ N/A
Material test reports (MTR)□ Yes □ N/A

5. Bearing and Seal Review

Bearing Design

ItemSpecifiedOfferedAcceptable
Bearing type□ Yes □ No
L10 life (hours)>15,000□ Yes □ No
Lubrication type□ Yes □ No

Seal Design

ItemSpecifiedOfferedAcceptable
Seal type□ Yes □ No
API 682 arrangement□ Yes □ No
Flush plan□ Yes □ No
Seal materials□ Yes □ No

6. Protection Systems

Mandatory Items

ItemRequiredIncludedNotes
Relief valveMANDATORY□ Yes □ No
Relief valve set pressure≤110%___ barg
Relief valve capacityFull flow□ Yes □ No
Pressure gauge□ Yes □ No

Optional Protection

ItemSpecifiedIncluded
Suction strainer□ Yes □ No
Pressure transmitter□ Yes □ No
Temperature sensor□ Yes □ No
Vibration monitor□ Yes □ No

7. Documentation Completeness

With Proposal

DocumentProvidedComplete
Completed datasheet
Deviation list
Performance curves
GA drawing
Sectional drawing
Material list
Reference list (min 3)
Delivery schedule
Spare parts list

Drawing Review

ItemYesNoNotes
Overall dimensions acceptable
Nozzle locations correct
Foundation loads provided
Maintenance clearances adequate

8. Commercial Terms

Warranty

ItemRequiredOfferedAcceptable
Warranty periodmonthsmonths□ Yes □ No
Warranty start□ Yes □ No

Delivery

ItemRequiredOfferedAcceptable
Delivery time (weeks)□ Yes □ No
Delivery terms□ Yes □ No

Spare Parts

ListProvidedPriced
Commissioning spares
2-year operating spares
Lead times

9. Exception Handling

Deviation Classification

ClassificationDefinitionAction
CriticalAffects safety or performanceResolve before award
MajorSignificant impactNegotiate resolution
MinorLimited impactAccept with documentation

Deviation Tracking

#DescriptionClassDecision
1□ C □ M □ Mi□ Accept □ Reject □ Clarify
2□ C □ M □ Mi□ Accept □ Reject □ Clarify
3□ C □ M □ Mi□ Accept □ Reject □ Clarify

10. Scoring Template

Weighted Evaluation Matrix

CategoryWeightScore (0-5)Weighted
Technical compliance35%
Performance verification20%
Materials15%
Vendor experience10%
Documentation quality10%
Commercial terms10%
TOTAL100%

Scoring Rubric

ScoreDescription
5Exceeds requirements, no deviations
4Meets all requirements
3Minor deviations, acceptable
2Significant deviations, needs work
1Major gaps
0Does not comply

Quick Reference: Must-Check Items

Non-Negotiable Requirements

  • Relief valve included
  • Viscosity range covers cold start to hot operation
  • Performance curves at specified viscosity
  • L10 bearing life ≥ 15,000 hours
  • Slip specified and acceptable (<10%)
  • Materials compatible with fluid
  • API 676 compliance (if specified)

Automatic Rejection Criteria

  • No relief valve
  • Cannot handle specified viscosity range
  • No performance curves provided
  • L10 life below minimum
  • Materials incompatible with process
  • No valid references
  • Incomplete mandatory documentation

Frequently Asked Questions

What is the most critical checklist item for screw pumps?
Viscosity range verification is most critical. Ensure pump covers full range from cold start (high viscosity) to hot operation (low viscosity). Missing this causes startup failures or poor efficiency.
How do I score vendor proposals objectively?
Use weighted scoring matrix with predefined criteria. Assign weights based on project criticality. Score each vendor 0-5 against each criterion and calculate weighted totals. Document all scores with justification.
What documentation must vendors provide?
Required: completed datasheet, performance curves at specified viscosity, deviation list, GA and sectional drawings, material list, reference list, and delivery schedule. Missing documents should trigger clarification request.

📚References & Sources

  • 1. API 676 - Positive Displacement Pumps—Rotary standard